# Schedules

Steps to set a schedule:

a.Go to Integration tab >> Synchronization section >> click "Clock"  for setting a schedule as shown in the below image.

![](/files/BrWqfdOPd0tSvxUHnTwK)

![](/files/aato30J18PIZOBBngyeH)

b. Once the schedule is set, check the same in the schedule Tab as shown in the below image.

![](/files/qjtHWqdq94qrRROOqSbn)

For you, we will set schedules as discussed earlier:

1. Schedule for ’**Synchronize JE from CSV to Sage Intacct**’ will be set for every 5 minutes as shown below.

![](/files/FoLTkVdRQGmgKVRW6Tq2)

&#x20;  2\. Schedule for ‘Synchronize Master Data from Sage Intacct to Flat File’ will be set for Daily once as shown below.

![](/files/UtRCXJ4iGya55aXSgLcm)

**Note:** No schedule is required for ‘Synchronize JE Status from Sage Intacct to Flat File’ as it is an Auto run process.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.greytrix.com/gumu-sage-intacct-blackline-integration/schedules.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
