> For the complete documentation index, see [llms.txt](https://docs.greytrix.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.greytrix.com/sage-crm-add-ons/crm-budget-planner/user-guide/creating-a-new-drawdown-against-a-budget-line-item.md).

# Creating a New Drawdown Against a Budget Line Item

The final step in configuring a budget is to create a **Drawdown** against a **Budget Line Item**.

A **Drawdown** represents a budget request that must go through the required approval process before the requested amount can be released or paid. Drawdowns are designed to support repeatable requests against a specific Budget Line Item.

#### Creating a Drawdown

To create a new Drawdown:

1. Open the required **Budget Line Item** from the Budget Summary screen.
2. Click the **New Drawdown** button available on the right-hand side.
3. The **New Drawdown** screen will be displayed.

Enter the required Drawdown details.

<figure><img src="https://794987320-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2F-MCRVg-TYx3gVa2Tqtf_%2Fuploads%2FMRZJS0O0ffUyL3ujqvEz%2FDrawdown.png?alt=media&amp;token=1158f34f-a85c-4f76-8124-3c5993e2f184" alt=""><figcaption></figcaption></figure>

<table data-header-hidden><thead><tr><th valign="top"></th><th valign="top"></th><th valign="top"></th><th valign="top"></th></tr></thead><tbody><tr><td valign="top">Field Name</td><td valign="top">Type</td><td valign="top">Description</td><td valign="top">Action</td></tr><tr><td valign="top">Net Disbursed this Period</td><td valign="top">Currency</td><td valign="top">The requested amount </td><td valign="top">No action</td></tr><tr><td valign="top">Month</td><td valign="top">Selection</td><td valign="top"><p>The month associated with this</p><p>Drawdown</p></td><td valign="top">No action</td></tr><tr><td valign="top"><p>Budget Line Capital</p><p>Expenditure</p></td><td valign="top">Read only</td><td valign="top"> </td><td valign="top">No action</td></tr><tr><td valign="top">Ref</td><td valign="top">Read only</td><td valign="top">The reference associated with the Drawdown. In this case 01-01 refers to the first drawdown of the first month</td><td valign="top">No action</td></tr><tr><td valign="top">Remaining Balance</td><td valign="top">Read only</td><td valign="top">The remaining balance on the Budget Line</td><td valign="top">Calculated field</td></tr><tr><td valign="top">Budget IT MIS</td><td valign="top">Read only</td><td valign="top">The remaining balance on the Budget </td><td valign="top">Calculated field</td></tr></tbody></table>

#### Saving the Drawdown

After entering the required Drawdown information:

1. Click **Save**.
2. The user will be redirected back to the **Budget Line Item** screen.
3. A summary of all Drawdowns associated with the selected Budget Line Item will be displayed.

The created Drawdown will now be available for further tracking and approval processing based on the configured budget workflow

<figure><img src="https://794987320-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2F-MCRVg-TYx3gVa2Tqtf_%2Fuploads%2FMoXzt5JB4fSlrgiAl8jq%2FLine%20Summary.png?alt=media&amp;token=6769316a-f496-450b-a60f-8af0b898c44c" alt=""><figcaption></figcaption></figure>

<figure><img src="https://794987320-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2F-MCRVg-TYx3gVa2Tqtf_%2Fuploads%2FCwpCW1KGx79b1UIHB988%2FDrawdown%20graph.png?alt=media&amp;token=5210e2ad-2e09-4209-8035-cfd2297613f4" alt=""><figcaption></figcaption></figure>
